Stora Enso invests in safety, saving 5 million euros

Arcteq delivered a medium-voltage arc quenching system to Stora Enso’s Anjala paper mill. The 6-kV switchgear retrofit project used the AQ 100 series arc protection system. The main goals were twofold: cost savings and extending the lifetime of the switchgear originally installed in 1976.

Both were achieved: five million euros were saved, while the switchgear gained a couple of decades to its life.

How? Read the reference case and find out how Stora Enso succeeded to make this substantial saving at their paper mill in Anjalankoski: https://www.arcteq.com/references/stora-enso-invests-in-safety/

Check out the reference case webinar here: https://www.youtube.com/watch?v=YAdCI9pRtmg&t=94s

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.